GWRC NEEDED MATERIALS for CAMP MAINTENANCE
ALL CAMPS
- Shingles other buildings than stated below
- Roof Felt
- Sheathing
- Stone/slag roadways and parking areas
- Insulation ceiling and walls
Stambaugh
- Shingles 106 square (6 buildings)
- Roof felt 25 rolls
- Garden carts 6 each
- Bunks for all cabins 186 each
- Double exterior door 1 set (Rotary Building
- Paint (exterior and interior)
- Construction material
- 2X4 treated and untreated
- 2x6 treated and untreated
- Sheathing
- T1-11 siding
- Material for parking area at Akela
- Tent Platforms
- Swimming Pool Liner
- New Swimming Pool
Stigwandish
- Training lodge
Exterior doors, 3 each
- Floor paint
- Shingles 15 square
- Gutters
- Boat house
- New man Door, 1 each
- Wall Caulking
- Roof cement, 5 - 5 gallon buckets
- Nature lodge Gutters
- Trading Post
- Insulation (attic)
- Windows (insulated), 10 each
- Storm Doors, 2 each
- Deck material
- Roadways - Stone, 15 tons
- Washer and dryer
- Ceiling insulation (Quarter masters & Maintenance shop)
- Utility trailer Large and Small
- Push Lawnmower
- Grass trimmer
- Lawn rakes
- 72-inch mower for tractor
- 48-inch pull behind self powered mower
- Fill dirt 8 yards
- Tent Platforms
- Picnic tables
return to main page